A12 Thörishaus – Weyermannshaus, Energy Supply of Roadside Equipment
As part of the total overhaul of the road section the power supply of the roadside equipment was extended and replaced.
Main Data
- Distance: 7.9 km
- Distribution systems: 12 pcs.
- Power collection points for central reservation crossings: 53 pcs.
- Power collection points on signalling support structures: 14 pcs.
- Barrier feeds: 3 pcs.
- Measuring and control cabin feeds: 9 pcs.
- Optical guidance system (Thörishaus covering): 390 m
- Lighting in hollow spaces of bridge (Weyermannshaus Viaduct): 1.8 km
Client
Civil Engineering Office of Bern Canton
Consultant
IUB Engineering Ltd.
Construction period
2006–2008
Construction costs
CHF 800,000
Scope of services
- Implementation planning
- Tendering and evaluation of bids
- Coordination of implementation and specialist construction management
- Commissioning and completion