New HEPP Borgnone, artificial lake of Palagnedra, Centovalli
New hydroelectric minicentral with Kaplan turbine of approx. 3.2 MW located at the exit of the Cavergno-Palagnedra supply tunnel. Flow rates between 5 and 30 m3/s and fall between 6-16 m.
Main Data
Main features of the project:
- External excavation in rock and loose ground up to 20 m in height with gradual lowering of the lake (total excavation volume 8'500 m3).
- Excavation of new tunnels (access and supply) and caves
- Enlargement of existing tunnels
- Costruction in concrete (ca. 3600 m3) h gradual raising of the lake
Client
OFIMA - Officine Idroelettriche della Maggia SA, Locarno / Svizzera
Consultant
IM Maggia Engineering Ltd
Construction period
2016–2018
Construction costs
17.0 Mio. CHF
Scope of services
For civil engineering, electromechanics and hydromechanics of the following SIA phases, general planner's mandate:
- 21 feasibility study
- 32 preliminary design
- 33 call for tenders
- 41 call for tender
- 51 construction design
- 52 construction and supervision
- 53 commissioning