Bahnhofplatz Square in Aarburg

Reconstruction of the existing square in front of the railway station and redesign of the bus stop

Main Data

  • Excavation: 800 m³
  • Road surface: 440 t
  • Concrete bus stop: 182 m²

Client

Aarburg Municipality

Consultant

IUB Engineering AG

Construction period

2008–2009

Construction costs

CHF 650'000

Scope of services

  • Construction project
  • Construction supervision
  • Coordination / temporary bus route