New Water Chamber Tal Water Cooperative, Bristen

In connection with the works on Bristen HPP, the old Stettenbord reservoir was converted into a water chamber.

Main Data

  • Water chamber in glass fibre reinforced plastic (GRP) with 4 inlet pipes
  • Various pipe adjustments and provisional measures

Client

Tal Water Cooperative (WGT) Bristen

Consultant

IUB Engineering AG

Construction period

2016

Construction costs

CHF 50,000

Scope of services

Phases 31-53