Reconstruction of Chärstelenbach Water Intake

Reconstruction of Chärstelenbach water intake in Bristen in conjunction with flood protection measures on Chärestelenbach stream. Demolition of the permanent weir sill and installation of a mobile gate (16 m) as well as replacement of bottom outlet gate. Complete replacement of the retain-ing walls, buttresses and downstream weir floor. Extension of the centre pillar, weir downstream face and left bank.

This is a complex flood protection project caught between the demands of flood protection, power plant use and winter construction site in the mountains. Exten-sive hydraulic steel measures adapted to the existing facility with challenging drainage under construction.

Main Data

  • Excavation: ca. 7,000 m3
  • Micropiles on weir down-stream face: total 120 m
  • Concrete demolition: ca. 500 m3
  • In-situ concreting works: ca. 500 m3
  • Block work: ca. 4,500 t
  • Gate dimension (damming height): 16 x 3 m
  • Bottom outlet gate dimensions: 3 x 2 m

Client

SBB - Kraftwerk Amsteg AG

Consultant

IUB Engineering AG

Construction period

2008-2010

Construction costs

CHF 1.5 million

Scope of services

  • Design for construction
  • Tendering
  • Execution design incl. construction supervision