Lagobianco Pumped Storage Power Plant - Lago Botul Satellite Lake

Repower is planning the 1000 MW Lagobianco pumped storage power plant between Lago Bianco and Lago di Poschiavo. Water will reach the underground powerhouse in Camp Martin via a 18 km pressure tunnel and 2.5 km pressure shaft, where 6 ternary machine units process 95 m3/s and 74 m3/s in turbine and pump mode respectively. The tailrace water flows back into Lago di Poschiavo via 2 tailrace pressure tunnels.

An ecological refuge is created with the satellite lake as a compensation measure. The existing Botul Bay will be separated from Lago di Poschiavo by a dam created using excavation material and will thus be spared the operation-related fluctuations in water levels. Lago Botul has a stable water level, shallow water areas, close to nature shore areas and via a bypass channel guarantees a longitudinal connection between Lago di Poschiavo and Botul Bay.

Lago Botul and the redesign of the Poschiavino delta are directly related to the material management of the Lagobianco Pumped Storage Power Plant project.

Données principales

  • Volume of lake: approx. 165,000 m3
  • Lake surface: approx. 5.5 hectares
  • Average lake depth: approx. 3.1 m
  • Permanent fills in delta area: approx. 535,000 m3 (960,000t)
  • Permanent dam fills: approx. 115,000 m3 (200,000t)
  • Dam height: approx. 16 m
  • Damming height: approx. 7.5 m

Maître d'ouvrage

Repower AG, Poschiavo

Ingénieurs du projet

IUB Engineering AG in consortium with IM Maggia Engineering AG

Période

2011–2014 (finalisation of detailed design)

Coûts de construction

Approx. CHF 11.2 million

Prestations

  • Study of alternatives and preliminary design
  • Design for construction and permit