N02 Amsteg - Meitschligen, Repair of Intschi Retaining Wall
The foundation of the retaining walls south of the Ried Tunnel portal (N02 between Amsteg and Wassen) had been eroded in a number of floods. A variety of measures were undertaken to ensure the structural safety of the existing support structure, to protect the bank zone from erosion as well as optimise drainage into the Reuss channel.
Données principales
- Support to the overall project manager during the design phase with project management, project coordination and adinsitratio
- Reporting, recording of minutes, documentation
- Construction management during the execution phase
- Cost, schedule and quality management according to ASTRA standards
- Services in procurement, contract management, claim management, invoice control
- Support with public relations work
Maître d'ouvrage
Astra (Federal Roads Office) Zofingen Branch
Ingénieurs du projet
IUB Engineering AG
Période
2009-2013 (with interruption)
Coûts de construction
CHF 1.1 million
Prestations
Owner’s engineering services and construction management for SIA phases selection procedure (22) to commissioning / completion (53)