A4 Flüelen Bypass, Gruonbach Oil Separator

An oil separator was constructed in Gruonbach for surface drainage (squares and roads) in conjunction with the completion works of the N4 Flüelen Bypass at the northern junction area.

Données principales

  • Concrete: 65 m3
  • Formwork: 330 m²
  • Reinforcement: 8.5 t
  • Sewage pipes: 85 m
  • Inspection and access shafts: 8 pcs.
  • Pipejacking (DN 600): 25 m
  • Anchoring (mortar anchors): 14 pcs.

Maître d'ouvrage

Uri Canton, Building Department

Ingénieurs du projet

IUB Engineering AG

Période

2007-2008

Coûts de construction

CHF 360,000

Prestations

  • Detailed design
  • Planning
  • Tendering
  • Construction supervision
  • Documentation of construction works