A4 Flüelen Bypass, Gruonbach Oil Separator

An oil separator was constructed in Gruonbach for surface drainage (squares and roads) in conjunction with the completion works of the N4 Flüelen Bypass at the northern junction area.

Dati principali

  • Concrete: 65 m3
  • Formwork: 330 m²
  • Reinforcement: 8.5 t
  • Sewage pipes: 85 m
  • Inspection and access shafts: 8 pcs.
  • Pipejacking (DN 600): 25 m
  • Anchoring (mortar anchors): 14 pcs.

Committente

Uri Canton, Building Department

Progettazione

IUB Engineering AG

Periodo di costruzione

2007-2008

Costi dell'opera

CHF 360,000

Prestazioni

  • Detailed design
  • Planning
  • Tendering
  • Construction supervision
  • Documentation of construction works