SBB Sulzegg Embankments – Immediate Measures Wall 11
A series of immediate measures (piles, anchors and shotcrete) were undertaken to secure unstable walls and additional monitoring points were introduced.
Rehabilitation directly above the Gotthard Railway line while under operation (secured with palisades, nets and alarm wire).
- Piles (d = 28 cm): 17 pcs.
- Anchors (d = 28 cm): 39 pcs.
- Shotcrete: 165 m2
Swiss Federal Railways (SBB), Department of Natural Hazards
Design and construction management phases 51-53