SBB Sulzegg Embankments – Immediate Measures Wall 11

A series of immediate measures (piles, anchors and shotcrete) were undertaken to secure unstable walls and additional monitoring points were introduced.
Rehabilitation directly above the Gotthard Railway line while under operation (secured with palisades, nets and alarm wire).

Dati principali

  • Piles (d = 28 cm): 17 pcs.
  • Anchors (d = 28 cm): 39 pcs.
  • Shotcrete: 165 m2

Committente

Swiss Federal Railways (SBB), Department of Natural Hazards

Progettazione

IUB Engineering AG

Periodo di costruzione

2013

Costi dell'opera

Approx. CHF 700,000

Prestazioni

Design and construction management phases 51-53