Construction of Water Pipeline Mättiwilstrasse, Horw Municipality
The existing water pipeline in Mättiwilstrasse, Horw Municipality was replaced. Construction works took place without interrupting traffic. A construction phase plan was developed. Traffic was regulated using a light signalling system.
- Length of water pipeline: 70.6 m
- Excavation: 275 m3
- Gravel concrete 0/16: 90 m3
- Foundation layer: 50m3
- Surface covering: 115 t
Horw Municipality Water Supply
- Tendering civil works
- Construction supervision and completion works