Replacement of the Utility Lines in Brambergstrasse

The Civil Engineering Authority of the City of Lucerne, Department of Urban Drainage, ewl Wasser AG and ewl Rohrnetz AG replaced the utility lines along the Brambergstrasse in Lucerne over a length of approx. 600m. The water, gas and mixed water pipes had to be replaced because of their condition. During construction works the road was closed off to traffic in sections and the bus operation was diverted. Brambergstrasse was resurfaced in the sections where the utility lines were replaced. The surface will be replaced along the whole width later.

Dati principali

  • Sewage water pipe PP-R DN 315-500: 510 m
  • Water pipe GD DN 150-300: 600 m
  • Gas pipe PE DN 180: 180 m
  • Base course layer AC T 32 S: 200 t
  • Base course layer AC B 22 S: 200 t
  • Base course layer AC T 22 N: 495 t
  • Concrete layer AC 11 S: 215 t
  • Concrete layer AC 11 H: 140 t

Committente

Civil Engineering Authority of the City of Lucerne and ewl Wasser AG / ewl Rohrnetz AG

Progettazione

IUB Engineering AG

Periodo di costruzione

2013–2014

Costi dell'opera

Approx CHF 1.05 million

Prestazioni

  • Construction project
  • Tendering, bid evaluation and recommendations on award of contract
  • Project execution
  • Commissioning