Design of Tskaltubo & Telavi Wastewater Treatment Plants, Georgia

The project consists of preparation of detailed designs for 2 new wastewater treatment plants to be constructed in Tskaltubo and Telavi.

Designs and drawings will be prepared for all civil engineering and structures works including screening building, sand trap, anaerobic ponds, trickling filters, secondary sedimentation tans, sludge drying beds, inlet pumping station, drainage pumping station, Venturi flowmeter, outlet structure, electrical chamber.

External works include water supply, firefighting system, sewage water system, storm water system, drainage.

Main Data

Telavi WWTP

  • 14,400m3/day
  • 52,000 PE

Tskaltubo WWTP

  • 6,171m3/day
  • 18,500 PE


Client

SADE CGTH (France), Georgia Branch

Consultant

IM Engineering Eurasia

Construction period

05/2017 – 11/2017

Scope of services

IM Engineering Eurasia has been retained as a subcontractor by SADE to provide functional, preliminary and detailed design as follows:

  • Design for process structures and wastewater treatment plants:

    • Detailed civil works and building designs
    • Detailed landscaping designs
    • Detailed electrical design for wastewater treatment plants

  • Design for non-process buildings/structures

    • Functional design, preliminary design report
    • Preliminary structural and building designs
    • Preliminary electrical and mechanical designs
    • SCADA, alarm system
    • Detailed electrical, heating, ventilation and sanitary designs

Design of Tskaltubo & Telavi Wastewater Treatment Plants, Georgia
Design of Tskaltubo & Telavi Wastewater Treatment Plants, Georgia