NEAT: Gotthard Base Tunnel, Requirements Management

The Consortium Transtec Gotthard is responsible for the detailed planning, execution and installation of railway engineering equipment. These works were conducted by the general contractor from under one roof. All the project phases are planned and implemented in accordance with EN 50126 and supported by a comprehensive high-level requirements management system.

Main Data

  • Longest rail tunnel in the world (57km)
  • Entire tunnel system (>157 km)
  • Installation at highest technical level
  • Design and execution in accordance with EN 50126
  • Approx. 4,600 recurring, identified requirements
  • Approx. 60,000 verifications

Client

AlpTransit Gotthard AG

Consultant

IUB Engineering Ltd.

Construction period

2008–2016

Construction costs

CHF 1,700,000,000 (works contract railway technology)

Scope of services

Organisation and coordination of the requirements management system.

  • Specialist requirement management
  • Support in the verification process
  • Development of processes