Bzhuzha (Georgia): Concept and project management run-of-river power plant (5 MW)
Diese Referenz ist derzeit leider nicht in der von Ihnen ausgewählten Sprache verfügbar. Sollten Sie Fragen dazu haben, geben wir Ihnen gerne Auskunft.
Bauherr
Georgian International Energy Corporation
Projektierung
IM Engineering Eurasia
Zeitraum
2018–2019
Baukosten
USD 6-7 millions
Leistungen
Assessment of the technical and economic feasibility, taking into consideration prevailing economic, hydrological, topographic, geological, infrastructure and environmental conditions
Detailed design
Project management and supervision
Liaison with the client
Beschreibung
The client intends to construct a 5 MW regulated run-of-river power plant on the River Bzhuzha with dam, settling basin, diversion pipeline, penstock and powerhouse. The generated capacity will flow to the existing 35 kV transmission line, which supplies electricity to local residents of the city of Ozurgeti. The project comprises a technical and economic feasibility study which will propose two alternative schemes. Jointly with the client the most efficient and economic option will be selected.