Trabzon (Turkey): New Hydroelectric Power Plant Büyükdüz
- Client
- Ayen Energy Co. Inc., Ankara / Turkey
- Consultant
- IM Maggia Engineering Ltd
- Period
- 2008–2012
- Construction costs
- € 80 million
- Scope of services
Feasibility study, construction design, tender documents, realisation and project supervision, workshop tests, general site supervision
- Description
New construction of a hydroelectric power plant on the Elmali and Tasoba rivers in northeast Turkey (Trabzon region). Construction of two reservoirs for daily compensation with intakes and fish pass, connection galleries, surge tank and forebay, penstock, power house, switchyard and transmission line.
- Main Data
- 2 reservoirs, intakes and desanders on the Elmali and Tasoba rivers with fish pass
- Gallery lengthtotal = 12 km, Ø 4 m
- Surge tank with forebay
- Penstock DN2000, L = 1690 m in welded steel
- Powerhouse:
- QA = 16 m³/s
- HN = 500 m
- PA = 70 MW
- 2 6-jet vertical Pelton turbines
- 2 spherical valves DN1000, PN64
- 2 generators 35 MVA
- 2 closed circuit cooling water systems
- 2 transformer units
- Switchyard